EPLAN Consulting
Interdisciplinary project planning PLC / electrical engineering
Data exchange between engineering, planning and PLC programming

Following topics will be covered
- Project planning of PLC controls and bus systems
- Addressing of PLC components
- Use of overviews and placements in the flowchart
- Structure and representations of PLC topologies
- Native data exchange to PLC systems (allocation list, TIA, AutomationML)
- Specific structure of PLC Parts and Macros (Single Part, Assembly)
- The workshop is individually adapted to your PLC manufacturer

Approach
- Workshop (2 days)

Your results
- The user learns the cross-discipline and cross-system design work method between the automation technology PLC and EPLAN
- Building sample data for further derivation
- The user can continue the learned methods independently

Requirements
- The workshop is individually adapted to the previous knowledge of the participants
- Knowledge of EPLAN Electric P8 is recommended
Are you interested in our consulting services?
Our experts from EPLAN Consulting are at your disposal.